Central Banks & Macro risk-off · 1–3 years
A what‑if from the future

What if NEOM cost overruns force a high-profile project descope?

Ballooning costs and low oil push Saudi Arabia to publicly scale back the flagship NEOM line, denting the diversification narrative and souring foreign sentiment toward the kingdom.

22%
our model probability
over 1–3 years
prediction markets — the market's odds
loading live odds…
◎ Anchored to measured history 22% · 90% range 10–35% · 26 dated precedents behind it — a wider range means thinner evidence

Every number ships with its receipt — the odds, the range, the precedents, and a public grade at Reality Check. The statistical machinery that produces it is proprietary.

The butterfly cascade

How this trigger trickles across markets, left → right — the root shock, its first‑order moves, then the ripple effects. Drag any node; tap a market for its real price history.

Resolution timeline — how this probability is moving

Our model's odds (electric blue) over time vs the market's (Polymarket, amber), from the past toward the 1–3 years horizon. Each dot is a real macro event that nudged the probability — green pushed it up, red pushed it down. Tap a dot for the source. Loading the probability audit trail…

loading the timeline…

What it would mean

If this plays out, it is a risk-off shock. Ballooning costs and low oil push Saudi Arabia to publicly scale back the flagship NEOM line, denting the diversification narrative and souring foreign sentiment toward the kingdom. The trigger decomposes into signed root‑shocks — Credit spreads ▲ · Global growth ▼ · Risk appetite ▼ — which propagate through our causal graph to the markets below.

Methodology. Probability and impact are anchored to history and scored against what actually happens — wins and losses, in public, at Reality Check. Market odds live from Polymarket & Kalshi. By Vikas Singh, Quantitative Strategist. Updated 2026-09-01.